

“Worldwide Projects: Innovation and Precision”
At M.I.G. Impianti We use cutting-edge tools and machinery to ensure the highest quality and efficiency. Our team is trained to work with materials such as steel, CuNi, and advanced plastics such as PE and PP.
Our Customers
Every client represents a success story for M.I.G. Impianti. From solutions for military vessels to the maintenance of luxury yachts, we bring the same dedication and professionalism to every project.



Our Recent Projects
Over the past two years, we have been involved in several projects, including the construction and installation of the water system of two vessels. Construction of a hospital building in Odense, Denmark., in the construction of 6 yachts at the Benetti shipyard (Viareggio and Livorno on various NT pipelines), for the construction of a system water mist on a military construction at the shipyard Fincantieri Palermo Project 62-95, refurbishment of the Asp. Casse line on Costa Pacifica and Serena with Mec. SHIP in Dry dock from iron to PPE (GF New Technologies) Dry dock with Luxury on Holland American Line, Dry dock with R. M. Srl on Carnival, MMH (Malta): works on Offshore platform, refurbishment of the fresh water line from steel to PPE on Aida Luna, metal carpentry works and various piping on Vincenzo Florio, replacement of bellows on MSC Brunella, refurbishment of piping and metal carpentry works on Norwegian Joy, fire-fighting system installation Costa Deliziosa.